City of Gaithersburg City of Gaithersburg
City of Gaithersburg Information for Citizens of the City of Gaithersburg Business Information for the City of Gaithersburg Information for Visitors to the City of Gaithersburg
Did You Know?
There are 61,469 residents in the City.
 TODAY  TOMORROW
Partly cloudy 80°
62°
Partly cloudy 84°
64°
Return to City of Gaithersburg Home Page
City of Gaithersburg News
Upcoming Events in Gaithersburg
Site Map
Frequently Asked Questions
The Master Plan
Select City Projects
The Gaithersburg City Government
Public Health & Emergency Info.
Contact Mayor Katz
Mayor & Council
City Manager
Committees
Legal Ads & Notices
Bids & RFPs
Budget
Strategic Plan
Annual Financial Report
Documents & Forms
City Code
Volunteer Opportunities
Employment Opportunities with the City of Gaithersburg
Information About the City of Gaithersburg
City Profile
City History
CHARACTER COUNTS!
Parks & Fields
Facilities
Regional Links
Gaithersburg City Departments
Office of the City Manager
Human Resources
Community and Public Relations
Finance and Administration
Parks, Recreation and Culture
Planning and Code
Police
Information Technology
Public Works
A Complete Listing of Services Provided by the City of Gaithersburg
Animal Control
Arts Programs
Crime Summary
Economic Development
Environmental Services
Community Services
Neighborhood Services
Permits & Inspections
RecXpress
Recycling & Bulk Pickup
Senior Services
Sports Programs
Youth Services
Submit a Request for Service to the City of Gaithersburg
Contact Members of the City Council, City Facilities or Departments to Request Service or Make a Suggestion
  Departments  :   Parks, Recreation and Culture  :   Arts and Special Events  :   News Article

Water Park Renovation 2012

Posted 5/5/2012

Phone:  301-258-6445
Fax:   301-258-6449
Email:  waterpark@gaithersburgmd.gov

The Water Park at Bohrer Park is undergoing major renovations and improvements for the 2012 season. Most notable work includes replacement of the main pool gutter system, new pool plaster, creation of a sixth lap lane, addition of two Water Slides and multiple play features, and a complete re-design of the tot pool to include an in-water multi-level play structure. Construction will be completed in time for opening day, which is May 26, 2012 (Saturday of Memorial Day Weekend).

The City of Gaithersburg completed a Facility Assessment Study, which concluded that obvious documented deterioration and the likelihood of eminent failure during the operating season was highly likely. Due to heavy use, aging equipment and materials, major components were failing and in need of replacement. A major modernization and capital repair project was recommended for the Main Pool and Tot Pool in an effort to preserve and maintain this amenity and operations for the next 20 years.

The project is scheduled to be completed in two phases.  Phase I includes the Main Pool and Tot Pool renovations. Specifically, the City will replace the existing ceramic rim-flow gutter with a stainless steel gutter system without altering the existing pool contours and water to deck relationships, re-pipe return lines and gutter line, replace decks and drains as required by approved design, restore the pool structure, install tile and plaster, and modify a section of the existing pool to convert it from a 5 lane x 25 yard lap swim area to a 6 lane x 25 meter competition pool area suitable to conduct training. This will provide an additional 889 SF of water surface to serve more patrons.  Additional work includes installation of an ultraviolet (UV) disinfectant system to protect patrons from water-borne pathogens for both pools and re-gelcoating the interior and exterior surface of the 336 foot white fiberglass slide.  

The existing Tot Pool will be completely replaced with a new pool design that will better utilize the available space within the enclosure.  Additional slides, play features and shade structures will be added to the facility as part of this project to provide customers with a new experience for the opening of the pool in 2012.

Water Park, May 2012
Filling the Pool, May 2012
Water park, May 2012
Filling the Pool, May 2012
Water park, April 2012
New Pool Plaster, April 2012
Water park, April 2012
New Pool Plaster, April 2012

Water Park Renovation
Play Structure Installation, March 2012

Water Park Renovation
Play Structure Installation, March 2012
Water park
Coping Installation Complete, February 2012
Water Park
Coping Installation Complete, February 2012
Main Pool, September 2011
Coping Installation, January 2012
Main Pool, November 2011
Coping Installation, January 2012
Close up of Consruction, December 2011
Gutter Installation, December 2011
Whole view of Construction, December 2011
Gutter Installation, December 2011
Main Pool, September 2011
Main Pool, September 2011
Main Pool, November 2011
Main Pool, November 2011
Tot Pool, September 2011
Tot Pool, September 2011
Tot Pool, November 2011
Tot Pool, November 2011

Comments or questions about this page?
Copyright © 2013, City of Gaithersburg
A CHARACTER COUNTS! City
Privacy Statement
TOP