Gaithersburg, MD
Home Main MenuHeadwaters Drainage Study
| Completed 8/7/2024: Status updated and Final Report posted. |
Introduction
The objective of the Headwaters Drainage Study project is to conduct a drainage study of the headwaters of the Muddy Branch, Lower Seneca Creek, and the Middle Seneca Creek watersheds to identify, evaluate, and prioritize opportunities for improving neighborhood level stormwater management (SWM) systems. The study will seek to:
- Evaluate existing conditions and identify “pinch points” in the drainage system;
- Address drainage complaints received from the community;
- Foster stakeholder engagement through community outreach efforts; and
- Inform future SWM system repairs and City capital improvement projects for greater climate resilience.